Checking the Solenoid Coils
Some locations may choose to do this procedure on a more frequent basis (i.e., quarterly, semi-annually, or other frequency).
![]() |
To avoid electrical shock or property damage, move the power switch to OFF and disconnect power. |
-
Remove power from the fryer.
-
Remove the solenoid wires from the wire nuts which are found behind the control panel.
-
Check across wires.
Volts/Phase | Results (Ohms) |
---|---|
208/240 Volt, 60 Hertz |
150 Ohms |
208/240 Volt, 50 Hertz |
230 Ohms |