Installing the Fryer

The CFE 415 must be attached to the right side of an existing PFE 500 with supplied hinges. A flat level surface is required for installation.

  • The unit must be attached to the right side of a PFE-500 fryer with the supplied hinges per these instructions. Failure to do so may cause the unit to be unstable which could lead to severe burns and / or injury.

  • Close and secure the PFE-500 fryer lid so hot oil does not splash while installing the CFE-415.
  1. Disconnect power from the PFE 500.
  2. Place the PFE 500 at about a 45° angle of the CFE 415.
  3. Rotate the hinges aligning them on the rear PFE 500 fryer frame rail.
  4. Secure the pivot hinge to the PFE 500 by installing the single screw (1) in each hinge (2).
  5. Install two screws (3) in each hinge, securing the hinges to the PFE 500 fryer.
  6. NOTE: When units are side by side the front of the units will not be flush.

  7. Rotate both fryer units so that they are side by side.
  8. Plug in both fryers.