Applies to:
OFE 390 and 392 Wiring Diagrams
Related Content
Information about the 390 and 392 Fryers
Installing the 390 and 392 Fryers
Operating the 390 and 392 Fryers
Programming the 390 and 392 Fryers
Troubleshooting the 390 and 392 Fryers
Inspecting the Counterweight Cables
Troubleshooting the SMS 20 Control Countdown
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignition Modules
Replacing the Ignitor Assembly
Testing and Replacing the Power/Pump Switch
Replacing the Drain Valve and Extension
Replacing the Drain Microswitch
Replacing the Lid Counterweight Cables
Reference