Fastron RTD Chart
Temperature (Fahrenheit) | Resistance Ohms |
---|---|
75 | 95,552 |
100 | 53,020 |
125 | 30,779 |
150 | 18,587 |
175 | 11,631 |
200 | 7,527 |
225 | 5,070 |
250 | 3,441 |
275 | 2,411 |
300 | 1,729 |
325 | 1,241 |
330 | 1,170 |
335 | 1,108 |
340 | 1,050 |
345 | 995 |
350 | 942 |
355 | 892 |
360 | 840 |
365 | 791 |
370 | 750 |
375 | 711 |
380 | 675 |
385 | 640 |
390 | 604 |
395 | 568 |
400 | 540 |
410 | 488 |
425 | 421 |
430 | 401 |
Related Content
Information about the OFE 290 or 292 Fryer
Installing the OFE 290 or 292 Fryer
Operating the OFE 290 or 292 Fryer
Programming the OFE 290 or 292 Fryer
Troubleshooting the OFE 290 or 292 Fryer
Inspecting Counterweight Cables
Testing and Replacing the Fuse Holders
Troubleshooting the SMS 20 Control Countdown
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Heating Elements
Testing and Replacing the Power/Pump Switch
Replacing the Drain Microswitch
Replacing the Drain Valve and Extension
Information about the 390 and 392 Fryers
Installing the 390 and 392 Fryers
Operating the 390 and 392 Fryers
Programming the 390 and 392 Fryers
Troubleshooting the 390 and 392 Fryers
Inspecting the Counterweight Cables
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignition Modules
Replacing the Ignitor Assembly
Testing and Replacing the Power/Pump Switch
Replacing the Drain Valve and Extension
Replacing the Drain Microswitch
Replacing the Lid Counterweight Cables
Information about the 580 and 582 Fryers
Installing the 580 and 582 Fryers
Operating the 580 and 582 Fryers
Programming the 580 and 582 Fryers
Troubleshooting the 580 and 582 Fryers
Cleaning the Safety Relief Valve
Calibrating and Cleaning the Pressure Gauge
SMS Control Special Programming
Testing and Replacing the Power/Pump Switch
Replacing the High Temperature Limit Control
Testing and Replacing the Fuse Holders
Replacing the Heating Elements
Replacing the Temperature Probe
Replacing the Drain Microswitch
Replacing the Lid Counterweight Cables
Adjusting the Lid Magnet Plate
Replacing the Nylatron Slides (Cam Slide Filler)
Information about the 590 and 592 Fryers
Installing the 590 and 592 Fryers
Operating the 590 and 592 Fryers
Programming the 590 and 592 Fryers
Training on the 590 and 592 Fryers
Troubleshooting the 590 and 592 Fryers
Cleaning the Safety Relief Valve
Inspecting the Counterweight Cables
Replacing the High Temperature Limit Control
Testing and Replacing the Fuse Holders
PFE 590 and 591 Electronic Control Retrofit Computron 7000 to New Electronic Controls
Retrofit Control Instructions 290-590 KFC to 291-591 GM
Retrofit 292-592 Fast KFC to 291-591 Controls Instructions
FM08-481 8 Head Replacing the Control
FM08-502 8 Head Replacing KFC Control
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Troubleshooting the C8000 Open Fryer Message
Replacing the Heating Elements
Replacing the Temperature Probe
Electric Power Cord Routing and Attachment Installation Instructions
PFE 592 (FAST Controls) to 590 (Henny Penny Controls) Retrofit Instructions
Testing and Replacing the Power/Pump Switch
Replacing the Drain Microswitch
Replacing the Drain Valve and Extension
Direct-Connect Retrofit Instructions (For use on fryers after SN: 290-BE0401001 & 591- LG014JC)
Filter Rinse Hose Retrofit Instructions
Replacing the Nylatron Slides (Cam Slide Filler)
Replacing the Lid Counterweight Cables
PFE 590 and 591 Installing Optional Crumb Basket
Rear Cover Removal Instructions
Label Application and Location for the 8 Head Fryer
Information about the 690 and 692 Fryers
Installing the 690 and 692 Fryers
Operating the 690 and 692 Fryers
Programming the 690 and 692 Fryers
Training on the 690 and 692 Fryers
Troubleshooting the 690 and 692 Fryers
Cleaning the Safety Relief Valve
Conversion From C8000 Control to KFC SMS Control
Conversion From Standard 690 Control to S/M Control
PFG 691 C8000 Retrofit Instructions
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Troubleshooting the C8000 Open Fryer Message
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignitor Assembly
Replacing the Ignition Modules
PFG-69X & OFG-39X Gas Valve Replacement Kit
Repositioning/Rewiring Air Valves for 220240V Model 690/390 fryers
Repositioning / Rewiring Air Valves for 120V Model 690/390 fryers
FM07-558 Gas Valve Replacement Kit
Manifold Retrofit Kit Instructions
PFG 690/691 Ignition Module Kit
Mounting the OFG 390 and PFG 690 Vacuum Switch
PFG 690 and 691 Temperature Probe CE Instructions
Replace Gas Valve Assembly with Gas Valve and Solenoid Assembly
Replacing Gas Valve Assembly With Gas Valve and Solenoid Assembly
Air Switch Monitoring Retrofit Kit Instructions
CE Gas Valve Adjustment Instructions
Testing and Replacing the Power/Pump Switch
Replacing the Drain Microswitch
Replacing the Drain Valve and Extension
PFG-690/691 & OFG-390/391 Pump Motor Relay Kit
PFG 690 and 691 Installing Filter Rinse Hose
Operating Instructions for PFG-691/OFG-391 Direct-Connect Oil System
Direct-Connect Retrofit Instructions (For use on fryers after SN: 391-LH016JC & 691-LH029JC)
Replacing the Lid Counterweight Cables
Calibrating and Cleaning the Pressure Gauge
I-Beam Cable Hole Plug Installation
Replace Nylatron Slides on PFG 690 and 691
PFG 690 and 691 Lid Cable Replacement
Installing Optional Crumb Basket
PFG 690 Stabilizer Retrofit Instructions
Reference
PFE 590 and 592 Inspection and Planned Maintenance
PFE 590 and 592 KFC Annual Inspection Certification