Applies to:
Control MAP Sequence of Operation
During fryer operation, the F5 MAP system is continually sending and receiving status messages for system components via the CAN bus. User initiated commands are received by the F5 touchscreen control and then sent as a CAN message packet to the appropriate device. Additionally, system initiated commands are also sent as a CAN message packet to the appropriate device. The control panel will display the appropriate information for that screen using the latest CAN status message values
-
User initiated commands: Pre-heat, Cook Cycle, Deep Clean
-
System initiated commands: Express Filter Prompt, Auto Top-Off
-
Heat related CAN messages: Control PMU or GMU
-
PMU or GMU performs oil temperature evaluation before heat demand
-
-
Filter and bulk oil related CAN messages: Control and PMU/GMU to OMS
-
OMS allows one filter or bulk oil operation at a time for the entire fryer
-
PMU or GMU provides oil level messages to OMS
-
Related Content
ATO System Sequence of Operation
ATO System Theory of Operation
Bulk Oil System Sequence of Operation
Bulk Oil System Theory of Operation
Cart Dispose System Sequence of Operation
Cart Dispose System Theory of Operation
Control MAP Theory of Operation
Electric Heat Sequence of Operation
Electric Heat Theory of Operation
Filtering Sequence of Operation
PMU Hi Limit Theory of Operation
Reference