Applies to:
LVE 300 Wiring Diagrams
208 – 240V Wiring diagrams labeled on unit
175924 F OMS Power Distribution Label
175945 C PMU/ High Limit Board Label
176076 L 5 Wire Interlock Power Box Label Diagram
178439 F Interlock, 208-240V, 3+G, 14kW Label
179349 F5 Control Diagram Label
179609 A Two Vat Cable Routing Diagram
179608 A Three Vat Cable Routing Diagram
179588 A Four Vat Cable Routing Diagram
380 - 415V 3NG Wiring diagrams labeled on unit
175924 F OMS Power Distribution Label
175945 C PMU/ High Limit Board Label
176081 J 3 Wire Interlock Power Box Label Diagram
178441 F Interlock, 380-415V, 3pH, 3NG Label
179349 F5 Control Diagram Label
179609 A Two Vat Cable Routing Diagram
179608 A Three Vat Cable Routing Diagram
179588 A Four Vat Cable Routing Diagram
Pin Voltage Diagrams
175924 F OMS Power Connector Pin Voltage Diagram
175924 F OMS Power Distribution Connector Pin Voltage Diagram
175945 C PMU/ High Limit Board Connector Pin Voltage Diagram
175946 J Non-Interlock Power Box Connector Pin Voltage Diagram
175955 C VDM Board Connector Pin Voltages Diagram
Block Diagrams
Electric Heat System Block Diagram Full Vat
Electric Heat System Block Diagram Split Vat
Power Distribution PCB Block Diagram
Related Content
Installing the LVE 300 Open Fryer
Operating the LVE 300 Open Fryer
Training on the LVE 300 Open Fryer
Programming the LVE 300 Open Fryer
Troubleshooting the LVE 300 Open Fryer
Information about the LVE 300 Open Fryer
Discarding Oil Using Front Dispose
Discarding Oil Using Rear Dispose
Discarding Oil Using Rear RTI Dispose
Discarding Oil Using Cart Dispose
Cleaning the Filter Pan Assembly
Replacing the Filter Pan Lid Gasket
Tighten Heat Probe and Element Spreader Bars
ATO System Sequence of Operation
ATO System Theory of Operation
Bulk Oil System Sequence of Operation
Bulk Oil System Theory of Operation
Cart Dispose System Sequence of Operation
Cart Dispose System Theory of Operation
Control MAP Sequence of Operation
Control MAP Theory of Operation
Electric Heat Sequence of Operation
Electric Heat Theory of Operation
Filtering Sequence of Operation
PMU Hi Limit Theory of Operation
Troubleshooting a Blank Display
Troubleshooting an E-10 High Limit Error
Troubleshooting an E-5 Error Oil Too Hot
Troubleshooting an E-6 Error Main or Temperature Probe
Troubleshooting an E-21 Error Recovery Fault
Troubleshooting an E-22 Error No Heat
Troubleshooting an E-31 Error Elements Up
Troubleshooting the Check JIB Message
Selector Valve Port Configurations
Replacing the Selector Valve Motor
Troubleshooting a Change Pad Reminder XX hrs. Error
Troubleshooting a Drain Pan Switch Failure
Troubleshooting an E-82D Selector Valve Error
Reference