Applies to:
Specifications
Height: |
61” (155 cm) |
Width: |
24” (61 cm) |
Depth: |
41¾” ( 107 cm) |
Floor Space: |
Approximately 7 sq. ft. (0.65 sq. m.) |
Vat Capacity: |
8 head of chicken - 21 lbs (9.5 kg) 100 lbs oil (45 Kg) |
Electrical: |
208 VAC, 3 Phase, 50/60 Hz, 17 KW, 47.2 Amps 240 VAC, 3 Phase, 50/60 Hz, 17 KW, 40.9 Amps 200 VAC, 3 Phase, (Delta), 50/60 Hz, 17 KW, 49.1 Amps 240 VAC, 3 Phase, (Delta), 50 Hz, 17 KW, 40.9 Amps 380 VAC, 3 Phase, 50 Hz, 17 KW, 25.8 Amps 400 VAC, 3 Phase, 50 Hz, 17 KW, 25.0 Amps (CE) 415 VAC, 3 Phase, 50 Hz, 17 KW, 23.7 Amps |
Heating: |
Two 8,500 watt electric immersion elements |
Shipping Weight: |
Approximately 758 lbs. (344 kg.) |
Vat Dimension side to side | 16 inches |
Vat Dimension front to rear | 20.25 inches |
Vat wall thickness | 14 gauge (0.075 in) (1.905 mm) |
Data Plate Location
A data plate, located on the right side panel, gives the information of the type of fryer, serial number, warranty date, and other information pertaining to fryer.
In addition, the serial number is stamped on the outside of the counter top.
Related Content
Information about the 590 and 592 Fryers
Installing the 590 and 592 Fryers
Operating the 590 and 592 Fryers
Programming the 590 and 592 Fryers
Troubleshooting the 590 and 592 Fryers
Cleaning the Safety Relief Valve
Inspecting the Counterweight Cables
Replacing the High Temperature Limit Control
Testing and Replacing the Fuse Holders
PFE 590 and 591 Electronic Control Retrofit Computron 7000 to New Electronic Controls
Retrofit Control Instructions 290-590 KFC to 291-591 GM
Retrofit 292-592 Fast KFC to 291-591 Controls Instructions
FM08-481 8 Head Replacing the Control
FM08-502 8 Head Replacing KFC Control
Troubleshooting the SMS Control Online Projection System (OPS) Connection
Replacing the Heating Elements
Replacing the Temperature Probe
Electric Power Cord Routing and Attachment Installation Instructions
PFE 592 (FAST Controls) to 590 (Henny Penny Controls) Retrofit Instructions
Testing and Replacing the Power/Pump Switch
Replacing the Drain Microswitch
Replacing the Drain Valve and Extension
Direct-Connect Retrofit Instructions (For use on fryers after SN: 290-BE0401001 & 591- LG014JC)
Filter Rinse Hose Retrofit Instructions
Replacing the Nylatron Slides (Cam Slide Filler)
Replacing the Lid Counterweight Cables
PFE 590 and 591 Installing Optional Crumb Basket
Rear Cover Removal Instructions
Label Application and Location for the 8 Head Fryer
Reference