Applies to:

Replacing the Fuse Holder

To avoid personal injury or property damage, before starting this procedure, move the main power switch to the off position. Disconnect the main circuit breakers at the circuit breaker box or unplug service cord from wall receptacle. Turn off the main gas supply to the fryer and disconnect and cap the main supply line to fryer, or possible explosion could result.

There are no fuse holder assemblies for the gas models other than that at the main power source.

Checking Procedure For Fuses

Control panel fuses 3 phase:

Check from #54 to #55 and #68 to #69 on fuse assembly. The circuit should be closed, if not, replace the fuse.

Cord and Plug Check

Perform a check on the cord and plug as follows: Test from each plug prong to the corresponding wire lead on the other end of the cord at junction box. The result should be a closed circuit on each line tested.

Wall Receptacle (Voltage Check)

Check the voltage across line L1 and L2. The voltage should correspond to the voltage shown on the data plate. If models have L3, check across L1 to L2, L2 to L3, and L1 to L3.