Applies to:

Replacing the Main Power Switch

To avoid personal injury or property damage, before starting this procedure, move the main power switch to the off position. Disconnect the main circuit breakers at the circuit breaker box or unplug service cord from wall receptacle. Turn off the main gas supply to the fryer and disconnect and cap the main supply line to fryer, or possible explosion could result.

The Main Power switch is a three way switch with a center OFF position. With the switch in POWER position, the fryer will operate. With the switch in the PUMP position, the filter pump will operate but the heating unit will not.

Continuity Check Procedure

Continuity Check Procedure - Off Position

Test Points Results
#60 to #59 then #60 to #67 Open circuit
#61 to #58 then #61 to #66 Open circuit
#62 to #57 then #62 to #65 Open circuit
#63 to #56 then #63 to #64 Open circuit
#60 to #61 Closed circuit
#62 to #63 Closed circuit

Continuity Check Procedure - Power Position

Test Points Results
#60 to #59 Closed circuit
#61 to #58 Closed circuit
#62 to #57 Closed circuit
#63 to #56 Closed circuit

Continuity Check Procedure - Pump Position

Test Points Results
#60 to #67 Closed circuit
#61 to #66 Closed circuit
#62 to #65 Closed circuit
#63 to #64 Closed circuit

Replacement

  1. Remove control panel.

  2. Label wires at the Main Power switch and disconnect wires at switch.

  3. Remove faulty switch and install new switch.

  4. Reconnect wires to switch in the same position as noted on the labels.

  5. Replace control panel

Related Content

Lowering the Control

Replacing the Timing Control

Replacing the Indicator Lights

Replacing the Fan

Replacing the Fuse Holder

Auxillary Buzzer Kit

SMS Retrofit kit

Electronic C2000 Simple Control Retrofit Kit

Installation of PFG 600 and PFG 600 SSI FM07-366 Electromechanical to C1000 Retrofit

C2000 Operating instructions

PFG 600 SSI Electronic C1000 to C8000 Retrofit Kit

RLink programming instructions

PFE 500/PFG 600 Wi-Fi Verification and Troubleshooting Instructions

PFE 500/PFG 600 Hybrid Control Installation Instructions

FAST Control Installation Instructions

2nd Generation Radio for SMS: Hardware Installation

2nd Generation Radio for SMS: Software Update

FM08-748 2nd Generation Radio for SMS: Troubleshooting

Instructions for Fryer Control Replacement Kits

SMS 20 Auto Polish Programming Instructions

PFG 600 Relay Retrofit

Hybrid Control and Wi-Fi Installation

Troubleshooting the SMS 20 Control Countdown

Replacing the High Temperature Limit Control

Checking the Temperature Probe Calibration for Chick-fil-A

Replacing the Temperature Probe

Replacing the Transformer

Testing Thermostat

Calibrating The Standard Single Stage Thermostat

Replacing the Thermostat

Replacing the Gas Burner Assembly

Replacing the Thermocouple

PFG 600 Gas Control Valve

Gas Conversion

PFG 600 SSI Fryers Gas Valve Replacement Kit

Installing the Spark Ignition

Mounting the Thermostat

Direct connect retrofit PFG 600

Direct connect retrofit PFG-600

PFG 600 Ignition Module Retrofit Kit

Temperature Probe Gauge Instructions

Reference

PFG 600 Inspection and Planned Maintenance

Wiring Diagrams

Error Codes

PFG 600 KFC Annual Inspection Certification