Applies to:
The transformer reduces the voltage down to accommodate those components with low voltage.
To avoid electrical shock or property damage, move the power switch to OFF and disconnect power. |
-
Remove the electrical power supplied to the unit.
-
Remove the control panel.
-
Remove the two (2) screws securing the transformer to the unit and remove transformer.
Mark wires before removal to insure new transformer is wired correctly.
-
Remove the wires from transformer.
-
Replace with new transformer and install in reverse order.
Related Content
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignitor Assembly
Replacing the Ignition Modules
PFG-69X & OFG-39X Gas Valve Replacement Kit
Repositioning/Rewiring Air Valves for 220240V Model 690/390 fryers
Repositioning / Rewiring Air Valves for 120V Model 690/390 fryers
FM07-558 Gas Valve Replacement Kit
Manifold Retrofit Kit Instructions
PFG 690/691 Ignition Module Kit
Mounting the OFG 390 and PFG 690 Vacuum Switch
PFG 690 and 691 Temperature Probe CE Instructions
Replace Gas Valve Assembly with Gas Valve and Solenoid Assembly
Replacing Gas Valve Assembly With Gas Valve and Solenoid Assembly
Air Switch Monitoring Retrofit Kit Instructions
CE Gas Valve Adjustment Instructions
Reference