Applies to:

Error Codes

DISPLAY

CAUSE

PANEL BOARD CORRECTION

“E-4”

Control board overheating

Turn switch to OFF position, then turn switch back to ON; if “E-4” continues, the board is getting too hot; check for signs of overheating behind the control panel; once panel cools down the controls should return to normal; if “E-4” persists, have control panel replaced

“E-5”

Oil overheating

Turn switch to OFF position, then back to ON;

if “E-5” continues, the heating circuits and temperature probe should be checked; once the unit cools down, the controls should return to normal; if “E-5” persists, have control panel replaced

“E-6”

Temperature probe failure

Turn switch to OFF position, then back to ON; if the “E-6” continues, the temperature probe should be checked; once the probe is repaired, or replaced, the controls should return to normal; if “E-6” persists, have control panel replaced

“E-41”

Programming failure

Turn switch to OFF position, then back to ON; if display shows “E-41”, the control should be re- initialized (See Programming Section) if the error code persists, have control panel replaced

“E-71”

Pump motor relay failure or wiring problem

Replace relay if contacts are stuck closed; check wiring on POWER/PUMP switch, or at wall receptacle; L1 and N may be reversed

“E-32, FAN FAIL ERROR, CHECK BLOWER, CLEAN DILUTIONBOX, CALL HENNY PENNY SERVICE” Air pressure switch open; clogged dilution box or faulty blower; open drain switch; open high limit Clean dilution box or replace blower if necessary; have drain switch checked; reset high limit or have high limit checked

CE Only - Along with the previous error codes, CE units have the following self-diagnostic error codes:

DISPLAY

CAUSE

PANEL BOARD CORRECTION

“E-10”

High limit

Allow oil to cool, and then reset the high limit by manually pushing and holding the reset (red rocker) switch for 5 seconds. If the high limit does not reset, the high limit must be replaced.

“E-15”

Drain switch

Close the drain, using the drain valve handle; if display still shows “E-15”, have the drain microswitch checked

“E-20A”

Air pressure switch failure

Press the timer button to try the ignition process again, and if “E-20A” persists, call Henny Penny’s Service (stuck closed) Department

“E-20B” Draft fan or air pressure switch failure (stuck open) Press the timer button to try the ignition process again, and if “E-20B” persists, call Henny Penny’s Service Department

“E-20C”

Left gas module failure

Press the timer button to try the ignition process again, and if “E-20C” persists, call Henny Penny’s Service Department

“E-20D” Right module failure Press the timer button to try the ignition process again, and if “E-20D” persists, call Henny Penny’s Service Department

“E-20E”

Both modules failure

Press the timer button to try the ignition process again, and if “E-20E” persists, call Henny Penny’s Service Department

“E-20F” Left module no flame sense Press the timer button to try the ignition process again, and if “E-20F” persists, call Henny Penny’s Service Department

“E-20G”

Right module no flame sense

Press the timer button to try the ignition process again, and if “E-20G” persists, call Henny Penny’s Service Department

“E-20H” Both modules no flame sense Press the timer button to try the ignition process again, and if “E-20H” persists, call Henny Penny’s Service Department

Related Content

Information about the 690 and 692 Fryers

Installing the 690 and 692 Fryers

Operating the 690 and 692 Fryers

Programming the 690 and 692 Fryers

Troubleshooting the 690 and 692 Fryers

Basic Operation

Cleaning the Dilution Box

Cleaning Deadweight Assembly

Cleaning Nylatrons

Cleaning the Safety Relief Valve

Inspect Counterweight Cables

Lubricating Lid Rollers

Reversing the Lid Gasket

Filtering

Operating Components

Cleaning the Blower and Vents

Changing the Filter Envelope

Maintenance Schedule

Special Programming

Programming

Unpacking

Selecting the Location

Replacing the Control Panel

FM08-502 8 Head Replacing KFC Control

FM08-481 8 Head Replacing the Control

Conversion From C8000 Control to KFC SMS Control

Conversion From Standard 690 Control to S/M Control

PFG 691 C8000 Retrofit Instructions

Troubleshooting the SMS Control Online Projection System (OPS) Connection

Replacing the High Temperature Limit Control

Replacing the Temperature Probe

Replacing the Transformer

Replacing the Gas Control Valve

Replacing the Airflow Switch

Replacing the Air Valve

Replacing the Flame Sensor Assembly

Replacing the Ignitor Assembly

Replacing the Ignition Modules

Replacing the Blower Assembly

8 Head Baso Retrofit Kit

PFG-69X & OFG-39X Gas Valve Replacement Kit

Repositioning/Rewiring Air Valves for 220240V Model 690/390 fryers

Repositioning / Rewiring Air Valves for 120V Model 690/390 fryers

FM07-558 Gas Valve Replacement Kit

Ignition Module Retrofit Kits

Manifold Retrofit Kit Instructions

PFG 690/691 Ignition Module Kit

Mounting the OFG 390 and PFG 690 Vacuum Switch

PFG 690 and 691 Temperature Probe CE Instructions

Replace Gas Valve Assembly with Gas Valve and Solenoid Assembly

Replacing Gas Valve Assembly With Gas Valve and Solenoid Assembly

Air Switch Monitoring Retrofit Kit Instructions

CE Gas Valve Adjustment Instructions

Testing and Replacing the Power/Pump Switch

Replacing the Solenoid

Replacing the Drain Microswitch

Replacing the Drain Valve and Extension

Installing the Pump Seal Kit

PFG-690/691 & OFG-390/391 Pump Motor Relay Kit

Pan Spacer Bracket

PFG 690 and 691 Installing Filter Rinse Hose

Operating Instructions for PFG-691/OFG-391 Direct-Connect Oil System

Direct-Connect Retrofit Instructions (For use on fryers after SN: 391-LH016JC & 691-LH029JC)

Replacing the Lid Counterweight Cables

Replacing the Nylatron Slides

Replacing the Pressure Pad

Tilting the Lid Upright

Calibrating and Cleaning the Pressure Gauge

I-Beam Cable Hole Plug Installation

Replace Nylatron Slides on PFG 690 and 691

PFG 690 and 691 Lid Cable Replacement

Replacing the Casters

Label Application and Location for the 8 Head Fryer

PFG 690 to 692 Retrofit Kit

Rear Cover Removal Instructions

Installing Optional Crumb Basket

Unpacking Instructions

PFG 690 Stabilizer Retrofit Instructions

Reference

Specifications

PFG 690 Wiring Diagrams

PFG 690 and 692 Inspection and Planned Maintenance

PFG 690 and 692 KFC Annual Inspection Certification