Applies to:
ALL CUSTOMERS
Replace Gas Valve Assembly with Gas Valve and Solenoid Assembly
Kit number
14298
Estimated Time
1 Hour
![]() |
To avoid electrical shock or property damage, move the power switch to OFF and disconnect power. |
Removal
-
Disconnect power and turn main gas off.
-
Disconnect 3 wires from gas valve terminals M, C & P
-
Disconnect pilot tube from gas valve.
-
Disconnect main gas tube from gas valve.
-
Disconnect and remove aluminum burner supply tubes
-
Remove 2 mounting screws and 2 spacers from gas valve mounting.
-
Remove gas valve assembly.
-
Remove gas valve from plumbing assembly.
-
Remove all 4 burners, and discard.
Replacement
-
Install 4 new burners.
-
Add gas valve to new plumbing / solenoid assembly (use pipe dope on pipe threads).
-
Insert gas valve / solenoid assembly. into fryer and align two mounting holes.
-
Secure gas valve / solenoid assembly to mounting bracket by using 2 screws and two spacers.
-
Re-connect main gas line to gas valve.
-
Re-connect 3 wires to gas valve terminals M, C & P.
-
Route two wires from solenoid through grommet to gas valve terminals M & C.
-
Re-connect pilot tube to gas valve.
-
Bend new supply tubes from ‘T’ to each burner using 2 tubes provided.
Related Content
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignitor Assembly
Replacing the Ignition Modules
PFG-69X & OFG-39X Gas Valve Replacement Kit
Repositioning/Rewiring Air Valves for 220240V Model 690/390 fryers
Repositioning / Rewiring Air Valves for 120V Model 690/390 fryers
FM07-558 Gas Valve Replacement Kit
Manifold Retrofit Kit Instructions
PFG 690/691 Ignition Module Kit
Mounting the OFG 390 and PFG 690 Vacuum Switch
PFG 690 and 691 Temperature Probe CE Instructions
Replacing Gas Valve Assembly With Gas Valve and Solenoid Assembly
Air Switch Monitoring Retrofit Kit Instructions
CE Gas Valve Adjustment Instructions
I-Beam Cable Hole Plug Installation
FM08-502 8 Head Replacing KFC Control
FM08-481 8 Head Replacing the Control
Label Application and Location for the 8 Head Fryer
PFG-690/691 & OFG-390/391 Pump Motor Relay Kit
Conversion From C8000 Control to KFC SMS Control
Rear Cover Removal Instructions
Replace Nylatron Slides on PFG 690 and 691
Installing Optional Crumb Basket
PFG 690 and 691 Installing Filter Rinse Hose
PFG 690 Stabilizer Retrofit Instructions
Conversion From Standard 690 Control to S/M Control
PFG 691 C8000 Retrofit Instructions
PFG 690 and 691 Lid Cable Replacement
Operating Instructions for PFG-691/OFG-391 Direct-Connect Oil System
Direct-Connect Retrofit Instructions (For use on fryers after SN: 391-LH016JC & 691-LH029JC)
Replacing the High Temperature Limit Control
Replacing the Temperature Probe
Replacing the Gas Control Valve
Replacing the Flame Sensor Assembly
Replacing the Ignition Modules
Replacing the Ignitor Assembly
PFG 691 Attaching the Rinse Hose Instructions
Reference
PFG 690 and 692 Inspection and Planned Maintenance