Applies to:

Add pressure gauge to PXE unit Instructions

Kit number

140536

Estimated Time

1 Hour

To avoid electrical shock or property damage, move the power switch to OFF and disconnect power.

  1. Disconnect power to the unit if connected.

  2. Remove rear panel for access.

  3. Remove top cap and discard.

  4. Disconnect fittings and replace tube with new tube.

  5. Reuse the same connector and relief valve, but replace the coupling with a Tee.

  6. Use existing U-bolt and nuts to secure the new tube to the unit.

  7. Use pipe thread sealant on all pipe threads.

  8. Install all the additional 1/4 in. plumbing and reducer parts.

  9. Use pipe thread sealant on all pipe threads.

  10. Install new top cap ensuring to pull the key ring on the relief valve through it's clearance hole. Use existing screws to secure the cap.

  11. Install the pigtail tube through the clearance hole and into the collar of the tubing that was just installed.

  12. Install the valve and pressure gauge, ensuring all plumbing connections are tight.

  13. Use pipe thread sealant on all pipe threads.

  14. Install rear cover back onto unit.

  15. Ensure valve handle is in the vertical open position with handle up. Ensure the valve can close with the handle horizontal and pointed towards the front of the unit.

Related Content

Replacing the Cam Guide

Replacing the Lid Cable

Replacing the Nylatron Vertical Strip

Armored Cable Grounding Installation Instructions for Australia

Lid Latch Adjustment or Replacement

Velocity Steam Box Swap-out Instructions

Velocity Nylatron Vertical Filler Strips Installation Instructions

Lid Handle Replacement Instructions

Securing Latch Pin Block

Lid Latch Replacement

Velocity Deadweight Orifice Clean-out Tool Installation and Maintenance

Velocity Lid Cable Replacement

Add pressure gauge to PXE unit Instructions (Japan / Hong Kong)

Instructions to replace PXE Interlock Latch Pivot Pin

Installing the Pump Seal Kit

ZigBee Radio Communication Kit

Replacing the Filter Valve

Save PXE 100 Setpoints

Selector Valve Motor/Encoder Replacement

Front Dispose Addition (for Bulk Oil Units)

Remove Selector Valve to ATO flex tube

Temp/Level Probe Fitting Replacement

Label Replacement Instructions

High Limit Protection Probe Installation (CE Version built prior to 5/2020, ALL Versions after)

High Limit Protection Probe Installation (UL Version built prior to 5/2020)

Menu Card Removal Replacement Instructions

Re-flashing Instructions

Save and Load Setpoint Instructions

PXE Pump Motor Installation

Flexible Line Replacement Kit (Formed Tube), (Standard, Bulk-Oil Fryer)

Flexible Line Replacement Kit (Formed Tube), (Standard, NON Bulk-Oil Fryer)

JIB Pump Retrofit

Velocity High Limit Adjustment Instructions

Reference

Specifications

Menu Structure

Heating Times

Product Racking Recommendations

Error Codes

PXE 100 Plumbing Diagrams

PXE 100 Wiring Diagrams

PXE 100 Inspection and Planned Maintenance

PXE 100 KFC Annual Inspection Certification