Applies to:

Armored Cable Grounding Installation Instructions for Australia

Kit number

140725

Estimated Time

30 - 45 Minutes

This kit was created for a one time use for JLL and Red Rooster, Australia to add a ground cable to Velocity PXE/OXE 100 fryers.

  1. To add the grounding wire, start by loosening the strain relief.

  2. Pull the cord through the relief far enough that the cord jacket is accessible.

  3. Strip cord jacket 1.25 in. There is a steel woven sheath under the cord jacket.

  4. Strip the jacket to the sheathing.

  5. There is a plastic covering on top of the steel sheathing that must be removed prior to installing the clamp.

  6. Install the ground clamp on the cord.

  7. Insert the ground wire into the ground clamp.

  8. Tighten the clamp onto the armored cable shielding.

  9. Pull the power cord slack out of the junction box.

  10. Tighten the cord strain relief.

  11. Attach the ground wire ring terminal to the ground stud.

Related Content

Replacing the Labels

Lid Latch Adjustment or Replacement

Label Replacement Instructions

Installing the Pump Seal Kit

ZigBee Radio Communication Kit

Replacing the Filter Valve

Velocity Nylatron Vertical Filler Strips Installation Instructions

Selector Valve Motor/Encoder Replacement

Velocity Deadweight Orifice Clean-out Tool Installation and Maintenance

Velocity Lid Cable Replacement

Instructions to replace PXE Interlock Latch Pivot Pin

Front Dispose Addition (for Bulk Oil Units)

Remove Selector Valve to ATO flex tube

Temp/Level Probe Fitting Replacement

High Limit Protection Probe Installation (CE Version built prior to 5/2020, ALL Versions after)

High Limit Protection Probe Installation (UL Version built prior to 5/2020)

Menu Card Removal Replacement Instructions

Save and Load Setpoint Instructions

Re-flashing Instructions

Flexible Line Replacement Kit (Formed Tube), (Standard, Bulk-Oil Fryer)

Flexible Line Replacement Kit (Formed Tube), (Standard, NON Bulk-Oil Fryer)

JIB Pump Retrofit

Velocity High Limit Adjustment Instructions

Replacing the Cam Guide

Replacing the Lid Cable

Replacing the Nylatron Vertical Strip

Velocity Steam Box Swap-out Instructions

Lid Handle Replacement Instructions

Securing Latch Pin Block

Lid Latch Replacement

Add pressure gauge to PXE unit Instructions (Japan / Hong Kong)

Add pressure gauge to PXE unit Instructions

Save PXE 100 Setpoints

PXE Pump Motor Installation

Reference

Specifications

Menu Structure

Heating Times

Product Racking Recommendations

Error Codes

OXE 100 Plumbing Diagrams

OXE 100 Wiring Diagrams

OXE 100 Annual Inspection

OXE 100 KFC Annual Inspection Certification

Specifications

Menu Structure

Heating Times

Product Racking Recommendations

Error Codes

PXE 100 Plumbing Diagrams

PXE 100 Wiring Diagrams

PXE 100 Inspection and Planned Maintenance

PXE 100 KFC Annual Inspection Certification