Applies to:

Securing Latch Pin Block

Estimated Time

30 Minutes

Only perform this procedure when the unit is cool or severe burns may result.

Procedure

  1. Remove the two screws at the rear of the lid cover.

  2. Tilt rear of lid cover up, then push toward the front of the fryer to remove the lid cover.

  3. Ensure the latch pin block is mounted tight to the lid handle wedlment. If this is loose replace latch pin block.

  4. Use gas tungsten arc welding (GTAW) with argon shield gas at 80-140 amps and a 316 L .062 in. stainless steel filler to fillet weld latch pin block top and bottom on the lid handle.

  5. Use a wire brush to remove heat discoloration.

  6. Replace lid cover and secure with two screws.

Related Content

Replacing the Cam Guide

Replacing the Lid Cable

Replacing the Nylatron Vertical Strip

Armored Cable Grounding Installation Instructions for Australia

Lid Latch Adjustment or Replacement

Velocity Steam Box Swap-out Instructions

Velocity Nylatron Vertical Filler Strips Installation Instructions

Lid Handle Replacement Instructions

Lid Latch Replacement

Velocity Deadweight Orifice Clean-out Tool Installation and Maintenance

Velocity Lid Cable Replacement

Add pressure gauge to PXE unit Instructions (Japan / Hong Kong)

Instructions to replace PXE Interlock Latch Pivot Pin

Add pressure gauge to PXE unit Instructions

Installing the Pump Seal Kit

ZigBee Radio Communication Kit

Replacing the Filter Valve

Save PXE 100 Setpoints

Selector Valve Motor/Encoder Replacement

Front Dispose Addition (for Bulk Oil Units)

Remove Selector Valve to ATO flex tube

Temp/Level Probe Fitting Replacement

Label Replacement Instructions

High Limit Protection Probe Installation (CE Version built prior to 5/2020, ALL Versions after)

High Limit Protection Probe Installation (UL Version built prior to 5/2020)

Menu Card Removal Replacement Instructions

Re-flashing Instructions

Save and Load Setpoint Instructions

PXE Pump Motor Installation

Flexible Line Replacement Kit (Formed Tube), (Standard, Bulk-Oil Fryer)

Flexible Line Replacement Kit (Formed Tube), (Standard, NON Bulk-Oil Fryer)

JIB Pump Retrofit

Velocity High Limit Adjustment Instructions

Reference

Specifications

Menu Structure

Heating Times

Product Racking Recommendations

Error Codes

PXE 100 Plumbing Diagrams

PXE 100 Wiring Diagrams

PXE 100 Inspection and Planned Maintenance

PXE 100 KFC Annual Inspection Certification